Skip to content
Monday – Friday: 7:00 a.m. – 4:30 p.m.(480) 555-0102

For architects and builders

What we need from you, and when

Little is needed to start. Each item below makes a sheet more exact; none of them holds up a first conversation.

  • The schematic set

    Plans and elevations, the count of baths, kitchens and outdoor fixtures, and any mechanical room the architect has drawn.

  • Fixture and appliance selections

    A specification sheet for each fixture. Rough-in data decides valve bodies, drain heights and carrier placement.

  • Structure and mechanical

    Framing, shaft sizes and the mechanical engineer's loads, so stacks and chases agree with the structure.

  • Revisions

    An issue date and a clouded change. We reissue the affected sheet only, and list what moved.

At design development

Questions we raise on paper

These come up on most custom homes. Each goes to the architect as a sketch and a question.

Typical conflicts

  • A drain that lands under a niche or a window

  • A pot filler on an exterior wall that sees a freeze or a heat load

  • A long hot-water run to a far primary suite

  • Two baths stacked over a bedroom, with no chase between them

  • A shower with several body sprays on one valve

Rows of grey plastic pipes with elbows running across a grey wall

Standing

What the builder's file should hold

The license and insurance details are in the footer. A certificate goes to your office on request.

  • License

    • Residential Plumbing Contractor · AZ Lic. 000000 · Arizona Registrar of ContractorsVerify

      The state license a plumbing business works under.

  • Insurance

    • General liability insurance · The carrier named on the certificate

      A certificate goes to the architect or builder on request.

A first conversation

Send the set, or just describe the house

We will reply to agree a time to review it together.